01Identify the DISCOM, consumer category, CA number, sanctioned load, roof rights and registered contact details.
02Review bills and roof constraints, then prepare a capacity recommendation and preliminary layout.
03Submit the current application, datasheets, single-line diagram and ownership/authority documents.
04Respond to feasibility observations before freezing procurement and final installation drawings.
05Install the approved configuration with required protection, earthing, labels, documents and meter provisions.
06Complete inspection, meter work, commissioning and portal closure; preserve the final approval records.